The price of a well varies by country. In Uganda, where Goutte d'Espoir builds the most, a well costs 360 euros and is completed in 3 to 5 weeks. In Niger, expect 1050 euros, and in Togo 1100 euros, with a timeline of 4 to 6 months. This gap comes from very different site conditions.
The depth of the drilling
The first factor is the depth needed to reach a usable water table. The deeper the water, the more the drilling demands time, equipment and materials. A shallow drilling stays affordable. A deep drilling mobilises more technical means, which weighs directly on the final cost.
Access to the site
The second factor is access. Bringing the drilling equipment, the cement and the pump to the village can be easy or hard depending on the roads and distances. When access is difficult, logistics take longer and cost more. This also explains the longer timeline of 4 to 6 months in Niger and Togo.
Local costs
The third factor gathers local costs: price of materials on site, labour, permits. These costs differ from one country to another. The listed price reflects the reality of the project in each country, with no artificial smoothing.
Comparing the countries
- Uganda: 360 euros, 3 to 5 weeks.
- India: 365 euros.
- Sri Lanka: 370 euros.
- Cambodia: 400 euros, 4 to 6 months.
- Niger: 1050 euros, 4 to 6 months.
- Togo: 1100 euros, 4 to 6 months.
A more expensive well is not a better well in itself. It matches a context where water is harder to reach or the site more remote. The service delivered stays the same: lasting access to water for the community.
The same result for the community
Whatever the country, a well serves around 40 people daily, and up to 400 beneficiaries depending on the village. The price difference comes from the project, not from the value of use for the residents.
A well in Togo costs more because water is harder to bring up there, not because it is worth more.
If you hesitate on the country, Uganda remains the most affordable option at 360 euros and the fastest. Niger and Togo require a larger budget, often gathered by several people. You can choose the country that fits your project and start the construction of a well.